Dairyland Power Cooperative

Interconnection Guidelines and Forms

Below are Dairyland Power Cooperative’s interconnection guidelines and applications for distribution substation interconnections and generation interconnections to the Dairyland Power Cooperative transmission system.

Please download the appropriate form and mail the completed form to:

Director of System Operations
Power Delivery Division
Dairyland Power Cooperative
3200 East Ave. S.
La Crosse, WI 54602-0817
For questions or inquiries related to these applications please email: tlt@dairynet.com
Follow us on Twitter
Follow us on Facebook
Click here to view the bird cam 
A Touchstone Energy Cooperative
Search
A Touchstone Energy Cooperative